JB Bill Groups
Company Tracker action: implementation-setup-jb-bill-groups
Milestone: Job Billing / Module Setup (milestone_id=8, core_milestone_id=2)
Order: 7
Estimated duration: 0.5 hours
Typical owner: Controller / Billing
Purpose
Define bill groups so selected contract items can present as one grouped line on the invoice when the client needs that presentation.
Prerequisites
- Contract items exist on the contract (JC/PM) before assignment.
- Know which contracts need grouped invoice presentation (most do not).
Vista configuration article
See the detailed Vista guide:
Field meanings and form steps live there. Do not restate them on this page.
Implementation guidance
- When in scope: only when a contract needs specific items grouped together for invoice presentation. Example: items 1.1, 1.2, and 1.3 should show as item 1 — assign them all to Bill Group 1, and use the invoice report that presents by bill group.
- Contract-specific: this setup is tied to the contract, not a company-wide master you invent for every job.
- Decide / Load: skip/hide when contracts bill items as-is. When needed, define groups and assign the contract items before initializing progress bills.
- Accept means Billing/Controller confirms which (if any) go-live contracts use bill groups and that the matching invoice report is in place.
Tips and gotchas
- Not required for every client — only when invoice presentation needs item roll-up.
- Wrong or missing bill group assignment mixes how items appear across invoices; set groups before you initialize progress bills.
- Presentation depends on the invoice report that shows bill groups.
Done when
- Either: bill groups are out of scope (action N/A / hidden), or
- In-scope contracts have bill groups assigned and the invoice report that presents them is confirmed.