Skip to main content
Share / Export

Implementation Balance - EM Equipment Cost

Getting Started

If you’ve incurred equipment costs prior to go-live—such as maintenance repairs, or ownership expenses—be sure to import these records to reflect accurate equipment history and balances.

Template Info

  • Required Source Data
    • Equipment #
    • Cost Code #
    • Cost Type #
    • Actual Date
    • Description
    • Cost
  • Optional Source Data
    • N/A
  • Additional Tips
    • The example shows importing summary balances by Equipment / Cost Code / Cost Type, but you can also import full Equipment detail using the same method. The only difference is the number of records—the required values and import steps remain the same.
  • Basic Steps
    • Download TAD Template
    • Copy the Source Data
    • Import the Records
    • Post Open Batch
    • Validate Imported Data

Download TAD Template

Open your source data file in Excel.

Download TAD Template screenshot

Click the Templates button on the left side of the ribbon.

Download TAD Template screenshot

If you've signed into TAD before, then you should receive the message below. Click Yes.

If you have not signed into TAD before, follow the Get Connected instructions.

Download TAD Template screenshot

Select the Implementation Balance – EM Equipment Cost template.

Click the Download Selected button.

Verify your Company number and click the Download button.

Download TAD Template screenshot

The EM Cost Adjustments sheet is used to import the job cost.

Download TAD Template screenshot

Copy the Source Data

Copy and paste the source data into the EM Cost Adj sheet. If your source data layout matches the example above, this will be a single copy and paste since the EM Cost Adj columns are already in the same order.

Copy the Source Data screenshot

Enter your Suspense or Clearing GL Account in the GLOffsetAcct column.

Copy the Source Data screenshot

Import the Records

Click the submenu of the Format Table button on the ribbon and choose the Regenerate Excel Formulas button. This will apply formulas to multiple columns.

Import the Records screenshot

The Mth column defaults to the current month. Update this value if you're loading balances as of the prior month.

Import the Records screenshot

Click the Format Table button to format the data you copied and to apply missing default values.

This will also apply the UM (Unit of Measure) based on the Equipment / Cost Code / Cost Type setup in Vista, and the GLTransAcct based on the EM Department setup in Vista.

Import the Records screenshot

The Result column will show Formatted for every record. You will see the default Company number applied.

Click the Get Batch # button to assign the next batch number.

Import the Records screenshot

The Result column will show Batch #XX Assigned for every record.

Click the Assign Batch Sequence button to assign a sequential value to each record.

Import the Records screenshot

The Result column will show Batch Sequence Assigned for every record.

Click the Validate Import button.

Import the Records screenshot

The Result column will show Validated for every record. If this says Failure, then the ErrorMsg column will provide the error.

Click the Execute Import button.

Import the Records screenshot

The Result column will show Imported for every record.

That completes all steps needed in TAD. You can now open the batch in Vista to validate and post.

Import the Records screenshot

Post Open Batch

Before opening the EM Cost Adjustments batch, you need to turn off Interfacing to the General Ledger. This prevents the batch from posting GL activity, which we do not want when loading these balances.

In Vista, go to Equipment → Programs → EM Company Parameters.

On the Adjustments tab, write down your existing value for the GL Adjustments Interface. Then select No Update, click Save and minimize the form.

Post Open Batch screenshot

Now you can open the batch in EM Cost Adjustments.

With the batch open, go to File → Process Batch, then click the Validate button followed by the Post button.

Once the batch posts, make sure to change your Interface Levels back to their normal values.

Validate Imported Data

You can validate the Job Cost by running the EM Cost Report report in Vista.

Enter your Company and the Ending Month for the month that you just imported.

Make all other parameters look like the image below.

Validate Imported Data screenshot

Verify the Total Dollars total at the end of the report matches the transactions that you imported.

Validate Imported Data screenshot