Configuring EM Standard Maintenance Groups
EM Standard Maintenance Groups group maintenance tasks that share an interval. Tasks may include required parts. Vista tracks next-due from last-done versus current meter readings and can create work orders with the predefined tasks and parts. Groups also support component-level maintenance.
Before you start
- Equipment meters and EM Equipment records are in place.
- Know the interval basis for each group: Hours, Miles/km, Fuel, or Annual date.
- Keep meter readings current; next-due logic depends on them.
Steps
- Open EM Standard Maintenance Groups.
- Enter the group code and description.
- Set the interval basis:
- Hours
- Miles/km
- Fuel
- Annual date
- Enter scheduling interval and warning thresholds the form exposes.
- Add maintenance tasks on the group. Optionally attach required parts (part, UOM, qty, required flag) so generated work orders include them.
- Configure linked groups, deletion-on-completion rules, last-done readings/dates, and cost/repair fields as needed.
- Respect form limits such as the 3,650-day ceiling where annual-date or day-based rules apply, and deletion-on-completion restrictions Trimble documents on the form.
- Assign the group to equipment (and components when maintaining attachments independently).
- After meters and last-done values are current, generate work orders from due maintenance so tasks and parts populate automatically.
Notes
- Stale meters produce wrong next-due dates. Update meters before relying on due lists.
- Related: EM Equipment Records, Entering EM Meter Readings, Editing EM Work Orders.