Skip to main content
Share / Export

IN Transfer Entry

IN Transfer Entry posts inventory transfers and tracks movement between locations. Use it when you have more than one location. Adjustments at a single location use IN Adjustment Entry.

There is no separate “how to process” or “about posting transfers” topic in Trimble help for this form — entry is batch-based like other IN programs; process with File → Process Batch.

Before you start​

  • Multiple locations set up in IN Locations.
  • Material is active and set up at both From and To locations (IN Location Materials).
  • Unit Cost / ECM overrides only if Allow Unit Cost Overrides is checked in IN Company Parameters.
  • Negative On Hand warning only if Display Warning if Qty On Hand is Negative is checked in IN Company Parameters (entry can still post after the warning).

Steps​

  1. Open IN Transfer Entry in a batch.
  2. Seq# = NEW for a new line, or an existing batch sequence to display.
  3. Enter Date (defaults today), From Loc, To Loc, Material, Units, Unit Cost, ECM, optional Memo (up to 30 characters).
  4. Edit only while the batch is open. After the batch is posted, rows cannot be edited — make adjusting entries instead.
  5. File → Process Batch → validate → preview reports → post.

Key fields​

FieldRule
UnitsPositive or negative; cannot be 0.00. If On Hand would go below zero and the warning option is on, you get a warning but can still post
Unit CostDefaults to current average, last, or standard cost for the From location’s Cost Method (IN Locations or IN Location Category Override). Override ≥ 0.00 only if Allow Unit Cost Overrides is on
ECME = Per Each, C = Per Hundred, M = Per Thousand; same override gate as Unit Cost
MemoUp to 30 characters

What posts​

  • On Hand updates on IN Location Materials at both source and destination.
  • Last and Average unit costs update at the destination only if the transfer date is on or after that location’s last purchase date (Last Cost Update).
  • Transfer values use Cost Method from IN Locations or IN Location Category Override.
  • If Cost Method is Std Unit Cost and entered Unit Cost ≠ Std Unit Cost, the difference posts to the Cost Variance account (IN Locations or category override).
  • GL: Debit destination location Inventory account, Credit source location Inventory account (location or category override accounts).

Trimble’s example (5 units @ $100) shows debit/credit of $100 on the GL table — treat the extended transfer value as Units × Unit Cost (per ECM) in practice; the help table may show unit cost rather than extended dollars.

Hard rules​

  • Posted batch lines are not editable.
  • Zero units are not allowed.
  • Negative On Hand is allowed after the optional warning.
  • Cost and ECM overrides are gated by company parameters.
  • Destination last/average cost updates are date-gated.

Notes​