JC Cost Adjustments
JC Cost Adjustments posts job-cost adjustments that cannot otherwise be entered through Payroll, AP, or other modules and interfaced to Job Cost. Use it for corrections to bad interfaced postings, added costs, month-end accruals, beginning balances, and reviewing or editing allocation-generated CA entries. It is not limited to simple job-to-job moves.
Before you start
- Know the jobs / phases / cost types and whether the adjustment is JC-sourced or tied to AP, EM, PR, MO/MS, or another JC Type.
- Have transaction (incurred) dates ready. Posting date is set later in JC Batch Process.
- Field tickets accept costs only while status is O-Open.
- You have permission to enter JC cost adjustments.
Steps
- Open JC Cost Adjustments and create or open a batch.
- Set JC Type (for example JC-Job Cost, AP, EM, PR, MO) so the form exposes the right source tabs. The transaction source description still shows as JC CostAdj; JC Type identifies the real source.
- Enter job, phase, cost type, amounts, Trans Acct / Offset Acct as required, and the per-line transaction date (actual incurred date).
- Complete AP / EM / Material / Payroll tabs when the JC Type needs company, vendor, reference, equipment, material location, employee, or related fields.
- Optionally assign a field ticket (O-Open only). Multiple adjustment lines can share one open ticket.
- For non-JC-source corrections, enter the back-out of the old information and the corrected entry (the original interfaced record cannot be edited).
- Optionally use File > Add Transaction to pull a previously posted transaction matching the batch month into the open batch.
- File > Process Batch, then validate, preview, and post in JC Batch Process (posting date applies to the whole batch).
Notes
- Allocation CA entries land here after Processing JC Cost Allocations. Re-running Process Allocations in the same month does not reverse prior CA entries and can duplicate. Delete bad CA lines, fix source costs, then rerun.
- Cost dates store in JCCD (transaction date per line; posting date from batch process). Revenue adjustments use JCRD.
- Related: Processing JC Cost Allocations, JC Revenue Adjustments, JC Company Parameters (Allow GL Account Override).